Pre Loader

Rehabilitation

The Challenges

  • Apply modifications to a construction due to the change of use – from residential to commercial – Villa to Coffeeshop from residential to a hospital these modifications requires different adjustments in the architectural, construction and services.

The Solution

  • Review the construction accurately through Architect designs and make actual visits to determine the status of the building And then to study the whole situation to find the best solution in terms of cost and applicability and maximize the benefit of the client of the proposed changes.

Result

  • Preparing designs and documents of implementation and accredited it from authorised departments.

The Challenges

  • Apply modifications to a part of construction after finishing the concrete.

The Solution

  • Find unconventional ways to modify the situation without wasting space or use additional columns.

Result

  • Customer satisfaction.